Message 002
Communication from the Commission - TRIS/(2021) 03045
Directive (EU) 2015/1535
Translation of the message 001
Notification: 2021/0544/GR
No abre el plazo - Nezahajuje odklady - Fristerne indledes ikke - Kein Fristbeginn - Viivituste perioodi ei avata - Καμμία έναρξη προθεσμίας - Does not open the delays - N'ouvre pas de délais - Non fa decorrere la mora - Neietekmē atlikšanu - Atidėjimai nepradedami - Nem nyitja meg a késéseket - Ma’ jiftaħx il-perijodi ta’ dawmien - Geen termijnbegin - Nie otwiera opóźnień - Não inicia o prazo - Neotvorí oneskorenia - Ne uvaja zamud - Määräaika ei ala tästä - Inleder ingen frist - Не се предвижда период на прекъсване - Nu deschide perioadele de stagnare - Nu deschide perioadele de stagnare.
(MSG: 202103045.EN)
1. MSG 002 IND 2021 0544 GR EN 11-08-2021 GR NOTIF
2. GR
3A. ΕΛΟΤ, ΚΕΝΤΡΟ ΠΛΗΡΟΦΟΡΗΣΗΣ ΟΔΗΓΙΑΣ 98/34/Ε.Ε, ΚΗΦΙΣΟΥ 50, 121 33 ΠΕΡΙΣΤΕΡΙ, ΑΘΗΝΑ, Τ/Φ: + 30210- 2120304, Τ/Ο: + 30210- 2120131
3B. ΥΠΟΥΡΓΕΙΟ ΥΠΟΔΟΜΩΝ & ΜΕΤΑΦΟΡΩΝ, ΓΕΝ. ΓΡΑΜ. ΥΠΟΔΟΜΩΝ, ΓΕΝ. Δ/ΝΣΗ ΣΥΓΚ/ΚΩΝ ΥΠΟΔΟΜΩΝ, Δ/ΝΣΗ ΟΔΙΚΩΝ ΥΠΟΔΟΜΩΝ (Δ13)', Λ. Αλεξάνδρας 19, 11473 Αθήνα,
Τηλ.: 210-6457402, αρμ.: Ν. Δημητρακόπουλος, e-mail:ndimitrakopoulos@dmeo.gr
4. 2021/0544/GR - B00
5. Draft Instructions for Road Project Studies for Road Guard-Rails (IRPS--RSR,
Issue 1) and accompanying instructions (installation, repair, etc., Issues 2,3,4,5)
6. Draft Instructions for Road Project Studies for Road Guard-Rails (IRPS--RSR,
Issue 1) and accompanying instructions (installation, repair, etc., Issues 2,3,4,5)
7. -
8. The draft Instructions of Issue 1 ‘Instructions for Road Project Studies – Vehicle Guard-Rails [IRPS--RSR]’ and its accompanying instructions (2,3,4,5), as drafted in the framework of the Technical Advisor Service Contract of 6 February 2019 to assist the Directorate for Road Infrastructures of the Ministry of Infrastructure and Transport in the revision of the existing since 2011 IRPS--RSR.
9. The development of studies and surveys on Vehicle Interception Systems (VIS) during the
ten years since 2011 with enrichment of data and
more accurate knowledge of the way they conduct – function from
fieldwork (physical tests), made it imperative to update and complement the current IRPS--RSR.
By enriching the text of the new IRPS--RSR and accompanying deliverables
an extensive case studies of issues is adequately addressed, at design level
(study), placement level (workshop – supervision) and quality assurance level (specifications – receipt of the project).
These Directives provide the basis for the country to obtain the necessary
technical tool for compiling reliable and complete insurance studies and correct placement of guard-rails under real conditions of configuration of
Greek roads.
The publication of the new IRPS--RSR 2021 is divided into 5 issues instead of one so far and
in particular:
• ISSUE 1: Updated and completed version of the current issue of instructions.
• ISSUE 2: Instructions for Installation-Maintenance-Repair of Guard-Rails (new
material).
• ISSUE 3: Instructions for the Recognition and Acceptance of Injected Guard-Rails from
Concrete (life assurance of at least 25 years).
• ISSUE 4: Instructions for the Study and Installation of Splices and Ends of Guard-Rails
(new material).
• ISSUE 5: Standard models for selection, application and placement of guard-rails
in special and exceptional circumstances or conditions.
10. No basic text(s) available
11. No
12. -
13. No
14. No
15. -
16. TBT issues
NO - The draft has no significant impact on international trade.
SPS aspect
No - The draft is neither a sanitary nor a phytosanitary measure
**********
European Commission
Contact point Directive (EU) 2015/1535
Fax: +32 229 98043
email: grow-dir2015-1535-central@ec.europa.eu