Message 002
Communication from the Commission - TRIS/(2021) 01618
Directive (EU) 2015/1535
Translation of the message 001
Notification: 2021/0261/D
No abre el plazo - Nezahajuje odklady - Fristerne indledes ikke - Kein Fristbeginn - Viivituste perioodi ei avata - Καμμία έναρξη προθεσμίας - Does not open the delays - N'ouvre pas de délais - Non fa decorrere la mora - Neietekmē atlikšanu - Atidėjimai nepradedami - Nem nyitja meg a késéseket - Ma’ jiftaħx il-perijodi ta’ dawmien - Geen termijnbegin - Nie otwiera opóźnień - Não inicia o prazo - Neotvorí oneskorenia - Ne uvaja zamud - Määräaika ei ala tästä - Inleder ingen frist - Не се предвижда период на прекъсване - Nu deschide perioadele de stagnare - Nu deschide perioadele de stagnare.
(MSG: 202101618.EN)
1. MSG 002 IND 2021 0261 D EN 29-04-2021 D NOTIF
2. D
3A. Bundesministerium für Wirtschaft und Energie, Referat E C 2, 11019 Berlin,
Tel.: 49 30 18615 6392, E-Mail: infonorm@bmwi.bund.de
3B. Fachkommission Bauaufsicht der Bauministerkonferenz, Konferenz der für das Bau-, Wohnungs- und Siedlungswesen zuständigen Minister/Senatoren der Länder (ARGEBAU)
4. 2021/0261/D - B00
5. Draft Model Ordinance on the Construction and Operation of Car Parks and Parking Areas
(Model Car Park and Parking Area Ordinance M-GarVO), version of 19 March 2021
6. Products for walls, pillars, ceilings, roofs, gates, lighting, as well as for building services equipment such as ventilation, fire extinguishing, fire alarm, safety power supply, smoke and heat extraction equipment, etc. in car parks
7. -
8. The draft Model Ordinance on the Construction and Operation of Car Parks and Parking Areas (MGarVO) applies to parking areas and car parks within the meaning of § 2(7) and § 49 of the Model Building Regulations [Musterbauordnung] and specifies the provisions of the Model Building Regulations concerning the above aspects in greater detail.
The draft rules contain general requirements, construction requirements (such as provisions on entrances and exits, ramps, parking spaces and lanes, clear heights, walls, ceilings, roofs, fire compartments, rescue routes and on safety equipment), operating requirements, provisions on required building documentation and final provisions.
9. The draft Model Ordinance on the Construction and Operation of Car Parks and Parking Areas (MGarVO) updates the Model Car Park Ordinance 2008 [Muster-Garagenverordnung 2008], bringing the legislation in line with legal and technical changes.
The update includes not only fire protection provisions, but also new provisions for the parking of bicycles and small electric vehicles in car parks, for the storage of combustible materials outside motor vehicles in parking areas and introduces a scope of application.
The fire protection provisions on the fire resistance of load-bearing components for medium and large car parks, the formation of fire compartments, the need for radio installations in the properties, smoke dissipation or fire alarm systems as well as the further details on the safety power supply take account of the requirements for public order and safety in view of current technical progress.
The notification is made on behalf of the 16 federal states of the Federal Republic of Germany.
10. The main texts have been submitted as part of an earlier notification: 2008/290/D
11. No
12. -
13. No
14. No
15. -
16. TBT Agreement
No - The draft has no significant impact on international trade.
SPS Agreement
No - the draft is neither a sanitary nor phytosanitary measure
**********
European Commission
Contact point Directive (EU) 2015/1535
Fax: +32 229 98043
email: grow-dir2015-1535-central@ec.europa.eu